Latest posts
-
Oracle Point Beach Deal: What the $300 Million Pledge Really Covers

Oracle will absorb about $300 million in rising Point Beach nuclear costs. The pledge is real — but it covers 125–250 MW of a 1.3 GW campus, and it lands six weeks after Oracle dropped its lawsuit against the Wisconsin regulator.